Factory Direct Partners
FDP Pro Series Upholstered Configurable S-Curve Accent Ottoman Seating Set (18" H) Collaborative Commercial Furniture for Hotel Lobby, Office, Restaurant, Waiting Room (6-Pack) - Teal
FDP Pro Series Upholstered Configurable S-Curve Accent Ottoman Seating Set (18" H) Collaborative Commercial Furniture for Hotel Lobby, Office, Restaurant, Waiting Room (6-Pack) - Teal
Couldn't load pickup availability
Brand: Factory Direct Partners
Color: Teal
Features:
- FDP PRO SERIES: high-quality, commercial-grade vinyl Ottomans for any environment from library to lounge, and anywhere in between
- SYNERGETIC SEATING: as versatile as your modern professional community, Ottomans are adaptable for standalone or integrated configurations
- INNOVATIVE LAYOUT: bundle of six S-Curve Ottomans join in unique serpentine shape - push together or apart for your desired arrangement
- STURDY DESIGN: robust, engineered wood frame with a smooth hand finished seating surface comes with pre-installed adjustable glides
- UNCOMPLICATED UPKEEP: both sturdy and soft, our leatherette is durable and easy to maintain; withstands daily wipe downs with a mild soap-and-water solution
model number: 15105-TL
Part Number: 15105-TL
Details: Enhance your professional environment with this FDP Pro Series Ottoman Bundle. The S-Curve Profile offers a fun and practical seating solution and is an ideal centerpiece for any communal space. These hand finished, commercial-grade Ottomans with sturdy wood frame meet and exceed industry testing standards for safety and durability. Beyond offering a stylish seating solution in your library, lounge or common area, Ottomans can also serve as perfect footrests or as handy side tables. The S-Curve Profile is comprised of six pieces that combine in a serpentine shape; portable ottomans allow for flexible re-arrangement in your area. The bundle includes six S-Curve Ottomans each with a seat height of 18 inches from the ground. Made in North America.
EAN: 0194657576527
Package Dimensions: 40.0 x 21.0 x 19.0 inches
Share
