Skip to product information
1 of 6

Factory Direct Partners

FDP Pro Series Upholstered S-Curve Ottoman Set 18" Height Collaborative Commercial Furniture for Hotel Lobby, Office, School, Restaurant, Library, Waiting Room (6-Piece) - Sky Blue

FDP Pro Series Upholstered S-Curve Ottoman Set 18" Height Collaborative Commercial Furniture for Hotel Lobby, Office, School, Restaurant, Library, Waiting Room (6-Piece) - Sky Blue

Regular price $4,258.99 USD
Regular price $8,517.99 USD Sale price $4,258.99 USD
Sale Sold out
Shipping calculated at checkout.
Quantity

Brand: Factory Direct Partners

Color: Sky Blue Crosshatch

Features:

  • FDP PRO SERIES: high-quality, commercial-grade vinyl Ottomans for any environment from library to lounge, and anywhere in between
  • SYNERGETIC SEATING: as versatile as your modern professional community, Ottomans are adaptable for standalone or integrated configurations
  • INNOVATIVE LAYOUT: bundle of six S-Curve Ottomans join in unique serpentine shape - push together or apart for your desired arrangement
  • STURDY DESIGN: robust, engineered wood frame with a smooth hand finished seating surface comes with pre-installed adjustable glides
  • UNCOMPLICATED UPKEEP: both sturdy and soft, our leatherette is durable and easy to maintain; withstands daily wipe downs with a mild soap-and-water solution

model number: 15105-145

Part Number: 15105-145

Details: Enhance your professional environment with this FDP Pro Series Ottoman Bundle. The S-Curve Profile offers a fun and practical seating solution and is an ideal centerpiece for any communal space. These hand finished, commercial-grade Ottomans with sturdy wood frame meet and exceed industry testing standards for safety and durability. Beyond offering a stylish seating solution in your library, lounge or common area, Ottomans can also serve as perfect footrests or as handy side tables. The S-Curve Profile is comprised of six pieces that combine in a serpentine shape; portable ottomans allow for flexible re-arrangement in your area. The bundle includes six S-Curve Ottomans each with a seat height of 18 inches from the ground. Made in North America.

EAN: 0194657576466

Package Dimensions: 40.0 x 21.0 x 19.0 inches

View full details